Name of Assignment / Project | Start Date | Completed Date | Client | Project Cost(NRs.) | Single/ JV |
---|---|---|---|---|---|
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Maing hat Khola Bridge along Baddichaur - Gutu Bijaura Road in Surkhet District | 2072/03/20 5th July 2015 | 2072/03/20 5th July 2015 | DDC. Birendranagar, Doti | 959370.00 | Single |
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Syaula Faleko Khola Bridge Along Chhinchu-Ghariwan Road in Surkhet District | 2072/11/11 4th June 2016 | 2072/12/11 4th July 2016 | DDC/DTO Surkhet | 961630.00 | Single |